Showing posts with label 24-hour work. Show all posts
Showing posts with label 24-hour work. Show all posts

Friday, October 16, 2015

Regional Groundwater Project Begins Construction Activities at Treasure Island RV Park Site

Beginning as early as this week, the San Francisco Public Utilities Commission’s (SFPUC) Groundwater Storage and Recovery project will begin construction activities. The scope of work includes drilling a new groundwater well that will be 590 feet deep, installing approximately 180 feet of pipeline and building a new well station adjacent to the Treasure Island RV Park in South San Francisco (please reference the map below for the exact location).

24-hour well drilling work will occur continuously for up to
one month inside the blue rectangle pictured above. 

The project anticipates well drilling will begin in October. Once this work begins, it will occur continuously for 24-hours a day for up to one month in duration. To minimize noise impacts, the contractor will monitor noise levels and install sound curtains with blankets to ensure the levels do not exceed the local noise ordinance. During night work, the contractor will rotate construction lighting to direct it away from homes near the well drilling work.

Questions?
For more information about this project, please call the 24-hour answering service at 866-973-1476, or visit the Project webpage at sfwater.org/GSR.

Friday, September 11, 2015

Mobilization & Construction Activities Begin at Lake Merced Golf Club GSR Site

This week, the San Francisco Public Utilities Commission's (SFPUC) Regional Groundwater Storage and Recovery (GSR) Project started mobilization and construction activities to prepare for drilling a new groundwater well that will be 620 feet deep at Lake Merced Golf Club in Daly City (please reference the map on the back for the exact location).

Once well drilling begins, work will occur continuously. To minimize noise impacts, the contractor will monitor noise levels and install sound blankets to ensure the levels do not exceed the local noise ordinance. During night work, the contractor will rotate construction lighting to direct it away from homes near the well drilling work.


24-hour well drilling work at Lake Merced Golf Club anticipates starting 
next week inside the blue rectangle pictured above. 

Once well drilling begins, work will occur continuously for up to one month. To minimize noise impacts, the contractor will monitor noise levels and install sound blankets to ensure the levels do not exceed the local noise ordinance. During night work, the contractor will rotate construction lighting to direct it away from properties near well drilling activities.


For more information about the GSR Project, please be sure to subscribe to this blog, visit sfwater.org/GSR or by calling us at (866) 973-1476.

Friday, August 7, 2015

Construction Notice: Regional Groundwater Project to Begin 24-hour Well Drilling in Colma

On Monday, August 10, the San Francisco Public Utilities Commission's (SFPUC) Regional Groundwater Storage and Recovery (GSR) Project will begin preparing the Colma Boulevard site for construction activities. Beginning as early as Monday, August 17, the GSR Project will begin drilling a new groundwater well that will be 690 feet deep near Colma Boulevard in Colma. Please reference the map below for the exact location.

24-hour well drilling work near Colma Boulevard anticipates starting on  
Monday, August 17 inside the blue rectangle pictured above. 

Once well drilling begins, work will occur continuously for 24-hours a day for up to one month in duration. To minimize noise impacts, the contractor will monitor noise levels and install sound blankets to ensure the levels do not exceed the local noise ordinance.  During night work, the contractor will rotate construction lighting to direct it away from properties near well drilling activities.