This week the project team notified neighbors closer to the north shaft of the project about pre-construction surveys. If you would like to have your home surveyed in the coming weeks, please contact 650-212-0165.
The controlled blasting that is taking place at the south shaft will move to the north shaft by mid-June.
Neighborhood Coffee: Save the date, Wednesday, June 24, 9 to 10 am. Members of the project team will be at Starbucks Coffee in the Crystal Springs Shopping Center to update you on the progress of the project and answer your questions. We invite you join us for a cup of coffee. Check back for details.
Friday, May 29, 2009
Wednesday, May 27, 2009
Controlled Blasting at South Shaft Runs Smoothly
Contractor Shank/Balfour Beatty is using controlled blasting to excavate into rock at the South Shaft. The blasting began on Tuesday, May 19th and was closely monitored. The blasting is taking place in accordance with OSHA and environmental regulations and all measures are in place to ensure nearby neighborhoods are not impacted by noise or dust. Blasting in the shaft and tunnel will continue until the contractor is ready to launch the tunnel boring machine.
Controlled blasting may take place at the North Shaft location in mid-June if necessary.
Friday, May 8, 2009
Pre-Construction Surveys
Friday, May 1, 2009
A Bird's Eye View (Helicopter)
Wednesday, April 22, 2009
Baden and San Pedro Water System Upgrades
JMB Construction, Inc., the Contractor working for the San Francisco Public Utilities Commission, will begin mobilization in early May for the water system upgrades at the following locations:
• West Orange Avenue and El Camino Real in South San Francisco
• B Street and Junipero Serra in Daly City
The work will improve the reliability of the regional water system, and reduce vulnerability and damage in the event of a major earthquake. The project will also provide greater operational flexibility to optimize the water delivery system to the City and County of San Francisco.
South San Francisco:
Monday to Friday: 8:00 am-5:00 pm.
Duration: May 2009 –Winter 2011
Daly City:
Monday to Friday: 7:00 am -5:00 pm
Duration: May 2009 – Winter 2010
Construction noise from heavy equipment and truck traffic can be expected and will be monitored. A noise reducing fence will be installed along the western and southern project boundaries, along West Orange and El Camino Real in South San Francisco.
• West Orange Avenue and El Camino Real in South San Francisco
• B Street and Junipero Serra in Daly City
The work will improve the reliability of the regional water system, and reduce vulnerability and damage in the event of a major earthquake. The project will also provide greater operational flexibility to optimize the water delivery system to the City and County of San Francisco.
South San Francisco:
Monday to Friday: 8:00 am-5:00 pm.
Duration: May 2009 –Winter 2011
Daly City:
Monday to Friday: 7:00 am -5:00 pm
Duration: May 2009 – Winter 2010
Construction noise from heavy equipment and truck traffic can be expected and will be monitored. A noise reducing fence will be installed along the western and southern project boundaries, along West Orange and El Camino Real in South San Francisco.
Friday, April 17, 2009
Ground Breaking Event A Success!
Yesterday's New Crystal Springs Bypass Tunnel Ground Breaking Event was a great success. Check out the news stories from KTVU, KCBS and the SF Chronicle.
KTVU News (Video), 4/17/09 SAN MATEO: Upgrade Of Hetch Hetchy Pipe System Gets Underway
KCBS News (Radio), 4/16/09 New Quake-Proof Pipeline to Deliver H2O to the Bay Area
SF Chronicle (Blog), 4/16/09 Tunnel time
KTVU News (Video), 4/17/09 SAN MATEO: Upgrade Of Hetch Hetchy Pipe System Gets Underway
KCBS News (Radio), 4/16/09 New Quake-Proof Pipeline to Deliver H2O to the Bay Area
SF Chronicle (Blog), 4/16/09 Tunnel time
Thursday, April 16, 2009
SFPUC, San Mateo County Officials Break Ground on New Tunnel Critical to Protecting Regional Water Supply After Major Earthquake
Excavation of a major new tunnel key to the reliable delivery of water to San Mateo County and San Francisco following a major earthquake began today in San Mateo County.San Francisco Public Utilities Commission (SFPUC) and San Mateo County Officials joined local neighbors to initiate the New Crystal Springs Bypass Tunnel groundbreaking two days before the 103rd anniversary of the 1906 Great Earthquake and Fire.
To view the press release, click the link below.
Subscribe to:
Posts (Atom)