Crews have finished a key project to control heavy volumes of eroding soil and rock that threatened to damage a major drinking water pipeline along the Crystal Springs Reservoir shoreline below parts of the Sawyer Camp Trail.
The specially fabricated "holey concrete" blocks, installed by hand into the hill, will allow returning young native plants to sprout through and around the newly stabilized slope.

No comments:
Post a Comment