Project Update
The contractor is forming the starter and tail tunnels at the bottom of the South Shaft. The tunnel boring machine (TBM) is being assembled on site and will begin its work in early October.
Watch for new photos soon!
Tour de Peninsula on Sunday, August 2nd
Local residents may notice bike riders on local roads on Sunday, August 2nd. The Tour de Peninsula 2009 returns to the area! To make sure the roads are as clean as possible, the contractor used a street sweeper machine this week on roads near our project.
Please watch the roads around San Mateo for bike riders on Sunday!
10 MPH Speed Limit Posted at Crystal Springs/Polhemus
And a reminder that the posted speed limit on Crystal Springs Road near the intersection of Polhemus Road at the site of our North Shaft is 10 mph at all times while posted during our project. This speed limit is for everyone's safety. And please always watch for bikes and pedestrians in that area.
Friday, July 31, 2009
Controlled Blasts Scheduled for August 3 - 7 for starter and tail tunnels
The contractor has scheduled controlled blasts at the South Shaft on Monday - Friday, August 3 - 7th. The blast on Monday, August 3rd is scheduled for approx 9am. Two blasts expected on Tuesday - one around 10:30am and one in the late afternoon. Multiple blasts per day may continue as needed - usually one in the morning and one late afternoon.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Tuesday, July 28, 2009
Controlled Blasts Scheduled for July 29th - 31st
The contractor has scheduled controlled blasts at the South Shaft on Wednesday - Friday, July 29th through 31st. Each blast is scheduled for approximately 1pm, depending on conditions at the site.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Monday, July 27, 2009
Controlled Blast Scheduled for July 28th in afternoon
The contractor has scheduled a controlled blast at the South Shaft on Tuesday afternoon, July 28th. Approximate time will be 1pm, depending on conditions.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Controlled Blast Scheduled for Monday, July 27th
The contractor has scheduled a controlled blast at the South Shaft on Monday afternoon, July 27th.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Friday, July 24, 2009
Controlled Blast Scheduled for Friday, July 24th
The contractor has scheduled a controlled blast at the South Shaft on Friday, July 24th.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Wednesday, July 22, 2009
Controlled Blast Scheduled for July 23rd after 1pm
The contractor has scheduled a controlled blast at the South Shaft on Thursday, July 23rd after 1pm.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.
Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.
Subscribe to:
Posts (Atom)