Extended Hours and Trucking for Concrete Pours in April


Concrete placement at Harry Tracy Water Treatment Plant
Starting as early as Tuesday, April 2nd, the Harry Tracy Water Treatment Plant project will be conducting four intensive concrete pour activities this month. Exact dates will be posted here on our blog, www.sfwater.org/Peninsula, and will be available by email - peninsula@sfwater.org - and on our 24-hour phone line, (866) 973-1476.

The concrete placement activities will require a large number of concrete trucks to travel along Crystal Springs Road in San Bruno to create the base slab for the new 11 million gallon Treated Water Reservoir. Pilot cars will regulate the speed and number of trucks entering and exiting the plant gate.

Work hours: 7:00am until at least 7:00pm
Long work days are planned to ensure the concrete base slab for each quadrant of the reservoir has adequate time to dry in current weather conditions.

To prepare for this concrete work, the contractor is maintaining a swing shift until 12:00 am on weekdays until further notice. Cranes and forklifts will be operated for the installation of slab reinforcement and seismic cables. Lights may be visible from the work area, but no additional truck traffic is anticipated for this preparation work.

Multiple shifts will continue on Saturdays and Sundays as they have for the past month.

We are making every effort to minimize construction impacts to surrounding neighborhoods.
Our construction crews and environmental monitors assess noise, vibration, dust, and other potential disturbances caused by construction in order to comply with all local, state and federal laws.

We work with the contractor to ensure all diesel trucks, equipment and generators are equipped with Best Available Control Technology for emissions reduction and that idling is minimized near schools and residences.

Let us know if you have other suggestions for minimizing disturbance or inconvenience. Please don’t hesitate to call our 24-hour phone line at (866) 973-1476 or email peninsula@sfwater.org with questions or concerns.  

Thursday, March 7, 2013

Extended Work Hours at Harry Tracy

The contractor will be working extended hours inside the Harry Tracy Water Treatment Plant beginning Saturday, March 9th with work near the gate at Crystal Springs Road and Crestmoor Drive.

Extended Work Hours
Saturday, March 9: 9:00 am to 5:30 pm
Sunday, March 10: 9:00 am to 5:30 pm
Monday-Friday: 7:00 am to 11:30 pm
Rebar going into the TWR tank for reinforcement 

Cranes and forklifts will be operating for slab reinforcement and seismic cable installation at the new Treated Water Reservoir (TWR). Lights may be visible in the area at night. No additional truck traffic is anticipated at this time.

Weekday evening work will continue to include future TWR construction activity until further notice. The contractor will monitor noise levels to maintain compliance with local ordinances.

The new, seismically strengthened reservoir will allow us to provide up to 140 million gallons of water per day, for 60 days, within 24 hours of a major earthquake.

Questions?
Please call our 24-hour hotline at (866) 973-1476.

Thursday, February 14, 2013

Intensive Work Necessary to Complete Upgrades through Late April

Construction Update

On Friday, February 15th, an intensive construction period for electrical and seismic upgrades will begin at the Harry Tracy Water Treatment Plant and regular Plant operations will be temporarily shut down.

During the first month of the shutdown, an extensive overhaul of the electrical system will be performed on the pump station and standby power building close to the Helen Drive gate in Millbrae. Expect more construction activity at this location.

Bird deterrent boxes have recently been placed on site for the nesting season to discourage birds from nesting in construction areas. These may be audible to our closest neighbors.

What to Expect

Work will be most intensive during the first five weeks of the shutdown. Crews will be scheduled in double shifts throughout the week and on weekends. Temporary outdoor lighting will be in place and may be visible to our neighbors on Helen Drive, however night work will primarily be indoors.

Noise levels will comply with all local ordinances. Nonetheless, this work may be disruptive during peak construction periods. We apologize in advance for any inconvenience this may cause.
  
Tented work at new treated water reservoir

Monitoring

Construction crews are actively monitoring noise, vibration, dust, and other potential disturbances caused by construction activities in order to comply with all local, state and federal regulations.

Truck traffic on Crystal Springs Road in San Bruno will continue during normal business hours for delivery of concrete and materials. Pilot cars will escort trucks along the road for safety.

We are making every effort to minimize construction impacts as crews work to accomplish this work during this short window of time.

Questions?
If you have any questions or concerns, please contact us: (866) 973-1476 or peninsula@sfwater.org

Please subscribe to this blog for updates; see the box to the right.

Thursday, February 7, 2013

CONSTRUCTION NOTICE: Upcoming Evening and Saturday Work

The contractor will be working extended hours inside the Harry Tracy Water Treatment Plant beginning this Friday, February 8th with work near the gate at Crystal Springs Road and Crestmoor Drive. Lights may be visible in the area during the evenings. No roads will be closed nor will traffic be impacted by this work.

The work includes backfill around a 96” pipe for the new treated water reservoir. Necessary backfill material will be brought in during the week between 9 am and 4 pm.

Dates:
Friday, Feb. 8, 7:00 am to 7:30 pm
Saturday, Feb. 9, 9:00 am to 6:30 pm
Monday, Feb. 11, 7:00 am to 7:30 pm
Tuesday, Feb. 12, 7:00 am to 7:30 pm
Wednesday, Feb. 13, 7:00 am to 7:30 pm
 

Morning at Harry Tracy
This work is necessary as the crews prepare to make critical connections at the plant during the next two months.

Questions?
Please call our 24-hour hotline at (866) 973-1476.
You may also SUBSCRIBE to this blog for email updates: see box to the right.

Wednesday, January 30, 2013

Increased Truck Traffic on Crystal Springs Road

The contractor at Harry Tracy Water Treatment Plant is conducting offhaul trucking operations this week and next week between 7am and 4pm. They are removing excavated dirt from the site now that the contractor has access to the disposal site.   
  
We work to ensure that all trucks and equipment are compliant with the project’s CEQA mitigation measures and the Bay Area Air Quality Management District’s air emissions control standards.

All loads will be covered and trucks will undergo wheel washing before leaving the site.

Increased truck traffic is expected on Crystal Springs Road in San Bruno.  Pilot cars will escort trucks at all times and flaggers will be working at the gate to the Plant at Crystal Springs Road and Crestmoor Drive.

Please subscribe to this blog for updates; see the box to the right.

Wednesday, December 26, 2012

Happy Holidays!

This holiday season, we celebrate the halfway point of the improvements projects at Harry Tracy Water Treatment Plant and the completion of pile driving. With your cooperation, we are proud to continue bringing you high quality, delicious Hetch Hetchy water.

Happy Holidays from our family to yours!

Wednesday, December 12, 2012

Less Evening/Weekend Work at Harry Tracy Water Treatment Plant

The construction team concluded its shutdown 5 days early and thus the demanding work hours to complete certain tasks under this deadline has relaxed.  The Plant has resumed regular water treatment plant operations as well as regular deliveries to the plant.

While daytime construction work will continue on our improvements projects, evening work has decreased. Weekend work will be reserved mostly for maintenance which is not expected to be disruptive.

Please call us 24 hours a day at (866) 973-1476 if you have any questions or concerns.