Thursday, February 2, 2012

Sawyer Camp Trail Remains Open During Construction!

The trail remains open sunrise to sunset during the water pipeline construction project, but please do not enter the trail before 6 a.m. or after sunset.

This week along Sawyer Camp Trail, you may see a hydroseed truck spraying the slopes. The hydroseed truck is accompanied by a water truck and is part of erosion control efforts that will continue through winter and spring 2012. The trucks will stay off the trail and use access roads whenever possible.

Near the southern trailhead, Ranger Pipelines is beginning work for the Crystal Springs Pipeline No. 2 Replacement Project. For the next two weeks, Crystal Springs Rd. between Polhemus and Skyline will be periodically closed to one lane. The lane closures will occur Monday to Friday, 8 a.m. to 5 p.m. only, but portions of the shoulder near Polhemus will be closed 24 hours a day.

Please contact us 24-hours at (866) 973-1476 with any questions or concerns.

Friday, January 13, 2012

Seismic Upgrades to Water System Resume at Sawyer Camp Trail

Work to prepare the trail for rain is underway at several locations along the southern-most 3-mile section. This Saturday two hydroseed trucks will seed hillsides along the trail. The trucks will primarily use water system access roads that run behind the trail. The hydroseed trucks must drive on Sawyer Camp Trail between the 2.3 and 3 mile markers and will be supervised by an environmental specialist at all times.

Next week, construction work to seismically upgrade the water pipeline adjacent to the trail resumes.

Increased truck traffic will be present on the trail Tuesday to Friday (January 17th to 20th). The trail will remain open sunrise to sunset. No trail closures are now scheduled, but we do expect short closures this winter. Please subscribe (see right) to receive automatic email updates.

Before sunrise, our contractor will be moving large equipment down the trail to pipeline work locations. Please do not enter the trail before sunrise! You will be entering an active construction zone.

Construction is taking place near the popular southern-most 3-mile section of the trail. If you haven’t discovered the northern section of the trail yet, now is a great time! The northern trailhead is in Millbrae and can be reached from I-280 via the Larkspur/Hillcrest Blvd. exit (southbound on 280) or via the Millbrae Ave. exit (northbound on 280). Turn west on Hillcrest Blvd. to the trail entrance.

Please contact us 24 hours a day at (866) 973-1476 if you have any questions or concerns about activity near Sawyer Camp Trail.

Friday, January 6, 2012

Critical Water System Work in January 2012

Neighbors of San Andreas Lake, just west of Highway 280 near the town of San Bruno, may have noticed the Lake’s recent low water level. This reservoir is low due to Water System Improvement Program work – not due to recent dry weather. Despite the lack of rain so far this winter, our region’s reservoirs are still in good shape thanks to heavy rain last year. The water level is expected to remain low in San Andreas Lake until our water pipeline is returned to service in late March 2012.

Also:
Underwater construction at San Andreas Lake is part of the Crystal Springs/San Andreas Transmission System Upgrade project. This project currently has several work locations throughout the 23-acre Peninsula Watershed. On Monday morning, January 9th three sequential deliveries of large pipe will take place from 7 a.m. to 9 a.m. on Crystal Springs Road in San Bruno just north of the Junipero Serra County Park and San Bruno City Park. Please call our 24-hour phone line if you have any concerns or questions!

Further south near Sawyer Camp Trail, crews will begin mobilizing equipment after the Martin Luther King holiday weekend in preparation for a “shutdown” of the water pipeline that runs next to the trail. Sawyer Camp Trail is expected to be open every day, sunrise to sunset, until the week of January 17th. We do expect a short trail closure that week or in late January. Please subscribe (see right) to receive an automatic email notification as soon as the exact closure dates are announced.

Wednesday, December 14, 2011

Lane Closure in December on Crystal Springs Road near Polhemus

Beginning Wednesday, December 14th, portions of Crystal Springs Road between Skyline Blvd. and Polhemus will be closed to one lane from 8 a.m. to 5 p.m. Flaggers will be present to direct traffic through one open lane at all times. The work is expected to finish by December 23rd, Monday through Friday only.

Our Crystal Springs Pipeline No. 2 (CSPL2) runs through the area and provides water to San Mateo County. The CSPL2 project team is preparing for work to replace and upgrade this portion of the water pipeline in mid-2012.

Please call 24-hours a day with any questions: (866) 973-1476.

Monday, December 12, 2011

Construction Traffic Temporarily Diverted to Helen Drive in Millbrae

We are working in Millbrae on long term improvements at our Harry Tracy Water Treatment Plant. Due to unexpected repairs in the roadway at the Harry Tracy plant entrance on Crystal Springs Road, construction traffic must be temporarily redirected through the Helen Drive plant entrance.

Traffic flaggers will be present. This temporary traffic diversion is expected to take no longer than one week. Increased truck traffic on Helen Drive will be present only during the hours of 9 a.m. to 5 p.m., Monday to Friday.

Please call 24-hours with any questions or concerns: (866) 973-1476!


Friday, December 9, 2011

Saturday work on December 10th near Polhemus Road in San Mateo

Crews will continue landscaping work at the New Crystal Springs Bypass Tunnel South Shaft site near Polhemus Road in San Mateo.

They will be on site this Saturday, December 10th beginning at 9am. Crews have been directed to not use any loud equipment before 9am and to not make noise if they arrive on site to mobilize before 9am.

Dust control measures will be used to help prevent dust.


Work will continue at the site during the week of December 12th.

Please contact us if you have any questions or concerns: 866-973-1476.

Thursday, December 8, 2011

Lane Closure on Crystal Springs Road Near Sawyer Camp Trail – December 8 and 9

Thursday and Friday (December 8th and 9th) from 9 a.m. to 3 p.m., portions of Crystal Springs Road between Skyline Blvd. and Polhemus will periodically be closed to one lane. Flaggers will be present to direct traffic through one open lane at all times.

The Crystal Springs Pipeline No. 2 (CSPL2) team will be “potholing” – a limited activity with a small crew – in advance of work in 2012 to replace and upgrade the CSPL2 drinking water pipeline. This pipeline provides water to San Mateo County and runs through unincorporated San Mateo County, Hillsborough, Burlingame, Millbrae, San Bruno, South San Francisco, Brisbane and Daly City.

Please call 24-hours a day with any questions: (866) 973-1476.