Friday, November 9, 2012

Night Work Underway at Harry Tracy

As noted earlier, during this shutdown period our contractor may need to work double shifts. Now through November 21, the contractor will work evening shifts between 5:00 p.m. and 2:30 a.m., seven days a week.  We assure you, noise and vibration monitoring will take place during the evening shift although we do not anticipate disruptive activities.  

Night work is anticipated periodically through Monday, December 10th, during this temporary "shut down" in plant operations. Crews are now preparing tunnels and transmission lines for upcoming concrete pours.  The plant is scheduled to be back in service by mid-December and must be capable of drawing water from the Crystal Springs system following heavy rainstorms this winter.

Please call us 24 hours a day at (866) 973-1476 if you have any questions or concerns.