Friday, August 28, 2009

Controlled Blasts Nearing Completion!

We hope to end controlled blasting very, very soon, with one more blast scheduled for Monday, August 31st at approximately 10am, depending on conditions at the site.

All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.Controlled blasting can take place between 7am and 6pm Monday through Friday.

All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.

No comments:

Post a Comment