Tuesday, July 21, 2009

Controlled Blast Scheduled for Wednesday, July 22nd

The contractor has scheduled a controlled blast at the South Shaft on Wednesday morning, July 22nd.

All indicators for vibration, noise and air quality are below the thresholds and are measured constantly.

Controlled blasting can take place between 7am and 6pm Monday through Friday.All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.

No comments:

Post a Comment