Friday, June 12, 2009

Controlled Blasting Schedule for Week of June 14th

Controlled blasting will continue at the South Shaft on Monday, June 15th. Depending on conditions, a blast may also take place at the North Shaft. Additional blasts may take place through the week. Watch this blog for updates.

All indicators for vibration, noise and air particulates are below the thresholds and are measured constantly.

Controlled blasting can take place between 7am and 6pm Monday through Friday. All safety and noise control measures are in effect and the work is performed in accordance with California Occupational Safety and Health (OSHA) and environmental regulations.